When a business moves premises, the removal van is the easy part. The real question is whether your team can sit down on the first morning and simply get on with their work. That depends on internet, phones, cabling and a dozen smaller details, and several of them need arranging long before the boxes come out. Here’s a practical checklist to work through.
Start with the internet connection
This is the item most likely to cause trouble, so tackle it the moment you have an address. Broadband options vary from one building to the next, and a new line, especially a dedicated leased line, can take weeks or even months to install.
- Check which services are available at the new address, not just in the area
- Read your current contract for notice periods and any charges for moving
- Order early and get an installation date in writing
- Have a fallback for the first few days, such as a 4G or 5G router, in case the install slips
Survey the new building
Visit before you sign off the layout, ideally with whoever looks after your IT. An empty office can look ready and still fall short once people and equipment arrive.
- Are there enough network points and power sockets where the desks will go?
- Is existing cabling in good condition, and does it all test correctly?
- Where will the router, switches and any server live? They need a secure, ventilated spot.
- Will thick walls or awkward layouts need extra Wi-Fi access points?
Any new cabling is far easier to install before furniture goes in. If Wi-Fi has been a problem in your current office, our guide to fixing slow office Wi-Fi covers what to get right this time.
Sort out phones and numbers
Ask your provider early whether you can keep your numbers. Geographic numbers are linked to an area, so a longer move can complicate things on a traditional line, while hosted VoIP systems tend to be more flexible. A move is also a sensible moment to review your setup, as old-style lines are being retired. Our post on the landline switch-off explains what that means.
Protect your data before anything moves
Equipment gets knocked and dropped in transit, so assume something could fail. Before moving day:
- Run a full backup of servers and shared storage, and keep a copy off site or in the cloud
- Test that you can actually restore from it
- Check that files on individual computers are synced or backed up too
- Make an inventory of equipment, with serial numbers
If you’re not confident in your backups, start with the 3-2-1 backup rule.
Remember the small details
These are the things that tend to surface on day one:
- A new connection may mean a new public IP address, which can affect remote access, VPNs and any service that only allows your office address
- Printers and scanners may need reconnecting, including scan-to-email settings
- Door entry, alarms and card terminals may need their own setup
- Your address needs updating on your website, email signatures and online listings
Moving day and the first morning
Label every device and cable so each desk can be rebuilt quickly, and shut servers down properly rather than unplugging them. If you can, move at a weekend or a quiet time and set everything up before staff arrive. Then test it all: log in, print, make and receive a call, open shared files and connect to Wi-Fi from around the building.
Finally, don’t leave old computers or drives behind. Our guide to disposing of old computers safely explains how to retire equipment without risking your data.
Need a hand with your move?
We help businesses across London, Surrey and Sussex plan and carry out office IT moves, from connectivity and cabling to getting everyone back online. See our networks & infrastructure and IT support services, or get in touch to talk through your plans.